Drying a new building pad


Footers and utilities have been installed prior to Lime drying. Heavy rains prior to the building slab pour made the subgrade unsuitable.

Drying a wet building pad under roof


Building pad soil stabilization that is already under roof. Our relatively small equipment can get inside many buildings and dry the subgrade in preparation for concrete.

The “tiller”


This is the “tiller” on our excavator. This is how we mix the lime into the wet soil for drying and stabilization operations.